Friday, May 30, 2008

NOT everything, BUT a kitchen sink




We got our sink installed today by the plumber and I love it! The new style of pull-out handles, instead of the separate hose squirter is awesome, and we have the little built in soap dispenser (although that was tough to fill with an empty sink cabinet, not sure if I'll be able to do it when there is stuff under there). I've never been so happy to do dishes as I was this afternoon.

The plumber wasn't aware our bathroom was ready for him as well, so he will be back on Monday and bringing our toilet, wohoo! As he was going to put in the dishwasher, he pulled off the front bottom panel and realized that there was a leak happening, through evidence of old soap residue and water stains. The leak was probably going into the concrete (as it wasn't previously on anything other than the concrete slab) and therefore soaking into that so we didn't notice any puddles. Also, the feet on it are rusted in place and not adjustable. These two revelations add up to a new dishwasher! We're going shopping tomorrow.
I love my new sink though! The new style of pull-out handles, instead of the separate hose squirter is awesome, and we have the little built in soap dispenser (although that was tough to fill with an empty sink cabinet, not sure if I'll be able to do it when there is stuff under there). I've never been so happy to do dishes as I was this afternoon.

Thursday, May 29, 2008

Countertops are in! (well, mostly)




The Corian guys were here this morning. Yeay! The shelf piece (that goes on the half wall) wasn't templated quite right and it turns out that shelf isn't 100% level. Instead of fixing the shelf, they are just going to make it so you won't notice with the Corian. Right now, if you put the piece flat on top of the shelf, you would notice a little 1/4 inch piece of drywall between the backsplash piece and the shelf on one side. The other side matches perfectly with the shelf sitting right on top of the backsplash. Typical. They are just going to cut the shelf with a little notch to hide that extra 1/4 inch. You won't notice it at all once it's done, and in fact, no one has noticed that issue to date, except when they actually put the backsplash up and saw the deviation. The new shelf will be installed Monday or Tuesday. Luckily, it doesn't affect the plumber or electrician doing their jobs. The plumber will be in tomorrow to hook up the sinks, install the toilet and the shower fixtures. The electrician is coming Sunday morning to give us plugs and switches. Sadly, until he's here we can't use the dishwasher, disposal, or stove yet (even if the plumber hooks them up).

Friday, May 23, 2008

Willow's Perspective







When the weather gets warmer (or even if we have the heat too high in the Winter), Willow's favorite spots used to be our bathtub and brick floor in the kitchen. Poor Willow- we've gotten rid of both! He's found sanctuary in the shower stall- not as roomy as the tub, but still nice and cool. He better get used to it, because if his claws scratch the new jet tub, he better hope Erik is around to save him from my wrath. He does seem to enjoy the cool ceramic floor (now that it's done and we don't yell at him every time he's in there!), almost as much as the brick. He would have been devastated if we had put radiant heat in that floor! Dogs are so picky ;)

Thursday, May 22, 2008

One more week...

...until we have our countertop! I was hoping they could get it here sooner, but at least we have a day. Tomorrow the closets are supposed to be done, so we can put our clothes away over the weekend. It will be nice not to have them piled on a spare bed anymore. I don't know what else will be done next week before the countertop comes. The plumber can't finish till that is here. The electrician may come before then to finish all the switches and things- he's not dependant on the counter. We are finally able to see the light at the end of the tunnel!

Tuesday, May 20, 2008

Tile Completed!





I have to hand it to the tile guys- they worked late two days and got the job done! We are so pleased. Today they grouted the kitchen, replaced the wrong-colored tiles on the bathroom floor, grouted the bathroom floor, finished tiling the tub surround and then grouted it. Everything looks great. I love the grout colors we picked out- especially the silver grey in the tub surround. Even the tile guys commented that that was one of the best pairings in color they've seen. They agreed right away about replacing the floor tiles, and although it added another couple hours of work on their end, they were not too grumpy about it. I got a close up of the floor tile ini the kitchen to try to show the grout color, plus a close up of where the tub surround meets the wall, with a little white in between (where there is still mudding to be done, hence no paint) to try to show the bathroom colors. The biggest thing left now is waiting for our counter tops to be manufactured. Then we need the plumber and electrician back in to finish things up!

Floors!





The tile guys came yesterday afternoon and stayed until after 7:00pm to get the floors in, and most of the tub-surround. Turns out we needed a little more of the tub tile, which Erik went out for last night. We love the kitchen tile. It was inconvenient last night, though, when we weren't allowed to walk on it while the mortar set, so we had to walk out the back door, around the house and into the front door to put Keagan to bed. The bathroom is really starting to come together, but unfortunately, this morning we noticed a few of the floor tiles don't match the others. Either Lowe's sent a box of a different kind, or the "lot" of tile was not all matching. This is pain because the mortar has now set overnight. The tile guys are coming back today to finish the tub surround, and we'll have to inform them that they have to knock out and replace a few of the floor tiles as well. Sigh. If we had noticed this as they were going down, and mixed them up within the others, it would look fine, but currently they are all in one big chunk together on the floor, which makes it really noticeable. Grrrr....

Friday, May 16, 2008

Bathroom accessories



The bathroom got a bit of a face-lift today with our medicine cabinets and towel accessories going in. The carpenter also finished the backerboard for the tub surround and the drywall above. The Corian people came to template the countertop too, which makes us very happy!